18 Aug 2023, 12:59

@Hans-van-de-Ven-MRA-Master
Hello Hans, If there are 70 shaping points at a route that is a lot of manual labour, which would result in moving ALL the points instead of the ones not being on the road. I agree: check should still be done Please reconcider, this is not user friendly.
.